Low Capital

Low Capital
  • Due to the lower calcination energy requirements, LC3 is more economical to produce than OPC for similar performance.

  • Locations with a shortage of high-quality fly ash, low limestone quality or excess reserves of waste limestone, LC3 is more economical to produce than PPC. 

  • Due to its lower clinker content and lower capital investment required for calcination of clays, LC3 allows higher returns on capital investments.

  • Clay and limestone which are otherwise discarded by cement plants can be utilized in LC3 which leads to low raw material cost.